For three months,We raised the boat to the workshop
and lowered the boat after regular maintenance
to the surface ot the water.
Next, the boat built in 1960 was lifted by a crane,
and the shells and dirt on the bottom of the boat
were scraped off and placed in the workshop.
We will start regular maintenance from now on.